Dear Mr. Peters:
These comments are submitted on behalf of the Center for
Biological Diversity (the
“Center”), the San Gorgonio Chapter of the Sierra Club, and Cougar
Connection (collectively,
the “Conservation Groups”) regarding the Draft Environmental
Impact Report (“DEIR”) for the
Altair Specific Plan (the “Project”). The Project is anticipated
to result in many significant
environmental impacts that will degrade the current ecosystems on
the Project site, interfere with
mountain lion movement, and reduce the health and quality of life
in the surrounding
community. Yet, the CEQA mandated environmental review for the
Project is wholly
inadequate and fails to comply with the requirements of the
statute. For the reasons detailed
below, we urge approval of the Project be denied, or at the very
least substantial revisions to the
DEIR to better analyze, mitigate or avoid the Project’s
significant environmental impacts.
The Center is a non-profit, public interest environmental
organization dedicated to the
protection of native species and their habitats through science,
policy, and environmental law.
The Center has over one million members and online activists
throughout California and the
United States. The Center has worked for many years to protect
imperiled plants and wildlife,
open space, air and water quality, and overall quality of life for
people in Riverside County.
The Sierra Club is a national nonprofit organization of over
700,000 members dedicated
to exploring, enjoying, and protecting the wild places of the
earth; to practicing and promoting
the responsible use of the earth’s ecosystems and resources; to
educating and enlisting humanity
to protect and restore the quality of the natural and human
environment; and to using all lawful
means to carry out these objectives. The Sierra Club reports that
over 190,000 members reside
in California. The San Gorgonio Chapter of the Sierra Club focuses
on issues within the inland
empire, including Riverside County.
Cougar Connection is a non-profit, public interest organization
that is dedicated to the
preservation of Puma concolor, Cougar populations, open space, wildlife
connectivity, and
public education.
I. The Current Project Description Does Not
Represent The True Scope Of The
Project And Is Misleading.
Under CEQA, a “project” is defined as “the whole of an action,
which has a potential for
resulting in either a direct physical change in the environment,
or a reasonably foreseeable
indirect physical change in the environment . . . .” (Tuolumne
County Citizens for Responsible
Growth,
Inc. v. City of Sonora (2007)
155 Cal.App.4th 1214, 1222 (citing CEQA Guidelines §
15378, subd. (a).) An “accurate, stable and finite project
description is the sine qua non of an
informative and legally sufficient EIR.” (Cnty.
of Inyo v. City of Los Angeles (1977) 71
Cal.App.3d 185, 193; (San Joaquin Raptor Rescue
Center v. County of Merced (2007)
149
Cal.App.4th 645, 655 (project description held unstable and
misleading) [hereinafter “San
Joaquin
Raptor”].) “However, a curtailed,
enigmatic or unstable project description draws a red
herring across the path of public input.” (San
Joaquin Raptor, 149 Cal.App.4th, at 655.).
An inaccurate or truncated project description is prejudicial error
because it fails to
“adequately apprise all interested parties of the true scope of
the project.” (See City of Santee v.
Cnty.
of San Diego (1989) 214 Cal.App.3d 1438,
1454-55 [hereinafter “City of Santee”].)
“Only
through an accurate view of the project may the public and
interested parties and public agencies
balance the proposed project’s benefits against its environmental
cost, consider appropriate
mitigation measures, assess the advantages of terminating the
proposal and properly weigh other
alternatives.” (San Joaquin Raptor, 149 Cal.App.4th, at 655.)
Here, the Project Description for the South Parcel is unstable.
The Project Description
does not specify what will be developed on the South Parcel, and
instead lists a number of
potential uses, such as an educational facility, office/research
facility, convention center,
hospital, or cultural center. Each of these potential uses
presents unique impacts to the
environmental and local community.
Consequently, the DEIR provides no firm basis to assess the
environmental costs and
appropriate mitigation measures of the Project. (San
Joaquin Raptor, 149 Cal.App.4th, at 655.)
Traffic impacts will vary depending upon the nature and extent of
civic uses at the site. In turn,
the amount of traffic – including truck traffic – is a key factor
affecting the extent to which the
Project will contribute to increased air pollution. Moreover, the
noise and light impacts of the
Project will vary depending upon the actual development on South
Parcel – for example, a
hospital may result in emergency vehicles entering and exiting the
hospital in both the daytime
and nighttime. The sirens and flashing lights of these vehicles
will interfere with the behavior
and movement patterns of nocturnal wildlife, such as mountains
lions. Yet, the DEIR fails to
analyze or disclose any of the impacts of these foreseeable uses.
As such, the DEIR fails to inform decision-makers and the public
of the true scope of the
Project from which all interested parties could assess the direct
and indirect environmental
effects of the Project. (City of Santee, 214 Cal.App.3d, at 1454-55; San
Joaquin Raptor, 149
Cal.App.4th, 655; Communities for a Better
Environment v. City of Richmond (2010) 184
Cal.App.4th 70, 83-86.)
II. The Project Is Not Consistent With The
General Plan.
Land use decisions must be consistent with all applicable land use
policies, including the
General Plan and all of its elements. (See
Pfeiffer v. City of Sunnyvale City Council (2011) 200
Cal. App. 4th 1552, 1562-1563.) Unfortunately, the Project is
clearly inconsistent with multiple
General Plan policies, as set forth below.
A. Development of the Western Escarpment
violates Community Design Element
Policies 5.1, 5.2, and 5.3, among others.
The Community Design Element contains the following policies: (a)
Policy 5.1 requires
the protection of hillside areas from inappropriate development
that effects the visual backdrop
of the valley; (b) Policy 5.2 requires the retention of critical
escarpment and major hillside areas
to preserve open space on the west edge of the City; (c) Policy
5.3 requires the establishment of a
program to permanently protect critical hillside areas from
development. The Open
Space/Conservation element similarly contains Policy 5.1, which
states that the Western
Escarpment must be conserved through the development review
process.
The Project is directly at odds with these goals because it will
result in intensive
development of a substantial portion of the Western Escarpment. (See RCA Letter at 6 (“The
project site is currently undeveloped and located . . . in an area
known as the ‘escarpment’. . .
.”).) The DEIR claims consistency with these policies by noting
that the Project would retain 85
acres of land as open space. (DEIR at 3.9-11.) Retaining a mere 85
acres in light of the 270-acre
Project is inconsistent with these policies.
B. The Project violates Open Space and
Conservation Element Policies 3.2, 3.3, and
3.7, and Land Use Element Policy 6.3, among
others.
Conservation Element Policies 3.2 and 3.3 require that the City
coordinate with relevant
agencies in conserving biological resources and implementing the
Western Riverside County
Multiple Species Habitat Conservation Plan (“MSHCP”). (DEIR at
3.3-9.) As set forth below,
the Western Riverside County Regional Conservation Authority
(“RCA”) – which implements
and enforces the MSHCP – has informed the City in no uncertain
terms that the Project will not
be consistent with the implementation of the MSHCP. As such, the
City is not coordinating with
the RCA, but is instead frustrating the ability of the RCA to do
its job. The DEIR does not set
forth any facts demonstrating that it was coordinated with RCA,
but instead offers the conclusory
statement that “the project has coordinated with the County and
the RCA regarding the
implementation of the MSHCP.” (DEIR at 3.9-14.)
The Project also is inconsistent with Conservation Element Policy
3.7 and Land Use
Element Policy 6.3, which requires the maintenance and enhancement
of Temecula Creek,
Murrieta Creek, and the Santa Margarita River to ensure long-term
viability of wildlife
movement corridors. The DEIR concedes that the Project “could”
impede wildlife movement at
the intersection of Santa Margarita River and Murrieta Creek, but
conclusorily asserts that the
inadequate mitigation measures discussed below will render it
consistent. (DEIR at 3.9-14.) As
noted below, RCA, U.S. Fish and Wildlife Service (“USFWS”), and
California Department of
Fish and Wildlife (“CDFW”) all dispute this conclusion.
The Project also violates Implementation Program OS-9, which
requires that all
development proposals in MSHCP conservation areas and core
linkages “provide detailed
biological assessments, assess potential impacts, and mitigate
significant impacts to a level
below significance.” (DEIR at 3.3-4.) Similarly, Implementation
Programs OS-33, OS-34, and
OS-35 require that all developments be consistent with the MSHCP.
(DEIR at 3.3-5.) As
discussed further in section VII, the enforcing agencies have
concluded that (a) the Project is not
consistent with the MSHCP; (b) the DEIR does not provide adequate
biological assessments; and
(c) the DEIR fails to mitigate significant impacts.
C. The DEIR does not adequately explain the
Project’s consistency with other general
plan policies.
In Table 3.9-4, the DEIR attempts to claim consistency with all
applicable general plan
policies. Unfortunately, Table 3.9-4 does not explain in any
detail how the Project is consistent
with these various policies, and instead generally refers to
mitigation measures. The DEIR also
fails to offer any analysis regarding some policies, and instead
states “Not applicable,” without
any explanation as to why these policies are not applicable. (See,
e.g., DEIR at 3.9-12, 3.9-16,
3.9-19.)
III. The DEIR Fails to Adequately Analyze
The Impacts To Aesthetics.
The Aesthetics section of the DEIR contains numerous deficiencies
and inaccuracies.
For instance, the DEIR claims that the City “planned for
development at the Project site and did
not expect for it to remain as undeveloped, open space.” (DEIR at
3.1-17.) This is misleading.
The DEIR is correct that the Westside Specific Plan was approved
by the City in 1995, and that
the Plan would have permitted mixed used development adjacent to
the Project site. (DEIR at 1-
1.) However, the City’s 2005 General Plan contains the policies
discussed above, which prohibit
development on the Western Escarpment. To the extent that the
Westside Specific Plan conflicts
with the 2005 General Plan, the 2005 General Plan supersedes the
Westside Specific Plan. (See
Lesher
Communications, Inc. v. City of Walnut Creek (1990) 52 Cal.3d 531, 541 (a land use
planning decision that was originally consistent with the general
plan but has become
inconsistent must be brought into conformity with the general plan).)
The DEIR does not set forth adequate measures to mitigate the
substantial light pollution
caused by the Project. While the DEIR proposes a number of
mitigation measures such as
directing nighttime construction light downward (see DEIR at 3.1-18), there is no way to
mitigation the light impacts of installing thousands of people in
an undeveloped wildlife area.
The DEIR fails to cite any studies or biological opinions
indicating that the meagre mitigation
measures proposed are sufficient to mitigate impacts on wildlife.
(See DEIR 3.1-19.)
Furthermore, the aesthetic simulations in Figure 3.1-2 and Figure
3.1-3 do not appear to
be accurate. These figures appear to downplay the actual size of
the development, and also do
not specify whether these figures depict the Project with a four
to five story buildout, as
discussed in the Project Description section. The figures also
appear to have omitted to the
Western Bypass.
In any event, the DEIR is wrong in claiming that scenic views of
the hills and Western
Escarpment will not be impacted by the Project. (See DEIR 3.1-17.) The DEIR admits as much
sentences later, when it states that “the visual character of the
project site would change
substantially from undeveloped, open space to a high-density
urbanized development.” (Id.)
Contrary to the DEIR’s unfounded conclusion, such intensive
development on the Western
Escarpment cannot be mitigated to less than significant levels by
“adherence to the design
guidelines and development standards . . . .” (See DEIR at 3.1-18.)
IV. The DEIR Does Not Adequately Analyze
The Project’s Impacts On Air Quality.
The DEIR’s air quality impacts analysis is flawed because it fails
to take into account all
sources of air quality impacts resulting from the Project and
fails to adopt all feasible measures
to reduce the Project’s significant air quality impacts.
Californians experience the worst air
quality in the nation, with annual health and economic impacts
estimated at 8,800 deaths and $71
billion per year. (Cayan 2006.) The Project will further degrade
the region’s air quality by
generating considerable emissions from the construction phase,
ongoing operations, and the
many miles of vehicle trips generated by the Project.
In particular, the DEIR’s significance analysis is flawed because
it uses the “Localized
Significance Threshold” or “LST” methodology. (DEIR at 3.2-15.)
This is not a proper
threshold for this Project. According to South Coast Air Quality
Management District
(“SCAQMD”), LSTs only apply to project that must undergo CEQA or
NEPA review and “are
five acres or less.”1 In contrast, the Project
would develop at least 100 acres.
The DEIR fails to disclose the origin of construction emissions
data cited in the DEIR.
More specifically, the DEIR sets forth a chart of “Proposed
Regional Construction Emissions”
with various statistics which are described as estimated maximum
daily emissions. Yet, the
DEIR does not explain how these statistics were calculated, and
instead lists the source as “ESA,
2015.” (DEIR at 3.2-21.) Some of these statistics do appear on PDF
page 1062 of the
Appendices to the DEIR, and PDF page 104 lists “assumptions” that
were used, presumably in
calculating these statistics. However, these “assumptions are not
explained in any detail. For
example, PDF page 104 lists an assumption of “2 mile trip.” Does
that mean that construction
trips were calculated as being only 2 miles? PDF page 105 contains
an assumption that the
calculations include “internalization reduction,” but does not
describe this reduction or explain
its basis.
1 South Coast Air Quality
Management District, “Localized Significance Thresholds,” (available at
http://www.aqmd.gov/home/regulations/ceqa/air-quality-analysis-handbook/localized-significance-thresholds).
2 The Appendixes document
does not include page numbers, such that citations refer to the PDF page
number.
A. The DEIR fails to disclose or analyze
the impacts of the Project on sensitive
populations.
The DEIR does admit that the Project would result in emissions
above the SCAQMD
significance thresholds, and claims these significant impacts are
“unavoidable.” (DEIR at 3.2-
23.) The DEIR warns that the Project’s ROG and NOx emission
increases could contribute to
“additional air quality violations” or result in air quality
levels that are unhealthy for sensitive
populations. (DEIR at 3.2-24.) Nonetheless, the DEIR does not
include any analysis, studies, or
surveys to disclose the extent of these impacts on sensitive
populations.
The failure to include such analysis is a serious error in the
DEIR, given that the Project
involves the installation of a freeway within a few feet of
residential developments and within
close proximity to Old Town Temecula. As discussed below, the DEIR
indicates that residential
development may occur within 45 feet of the “centerline of the
Western Bypass” (DEIR at 3.10-
45), meaning that residential development may occur immediately
next to the Bypass, with no
buffer. The Western Bypass also will be sited in very close
proximity to the proposed
elementary school, which will be occupied by approximately 700
children. Each of these 700
children are classified as “sensitive receptors.” Numerous studies
have documented the air
pollution and health impacts associated with siting expressways
and freeways in close proximity
to residential development, particularly upon sensitive receptors
such as children and the elderly.
(Lin 2000.) Nonetheless, the DEIR fails to offer any analysis of
these significant impacts
associated with the Project.
B. The DEIR does not require all feasible
measures to mitigate the air quality impacts
of the Project.
In light of these major air quality impacts, “the EIR must propose
and describe mitigation
measures that will minimize the significant environmental effects
that the EIR has identified.”
(Napa Citizens for Honest Gov’t v. Napa County Bd. Of Supervisors (2001) 91 Cal.App.4th 342,
360.) CEQA requires that agencies “mitigate or avoid the
significant effects on the environment
of projects that it carries out or approves whenever it is
feasible to do so.” (Pub. Res. Code §
21002.1(b).) Mitigation of a project’s significant impacts is one
of the “most important”
functions of CEQA. (Sierra Club v. Gilroy City
Council (1990) 222 Cal.App.3d 30,
41.) Only
when the mitigation measures are “truly infeasible” can the lead
agency reject mitigation
measures for significant impacts. (City
of Marina v. Board of Trustees of California State
University
(2006) 39 Cal. 4th 341,
369.)
Here, despite acknowledging that the Project will result in
significant air quality impacts,
the Project includes only six mitigation measures (MM-AQ-1a
through MM-AQ-1e and MMAQ-
2), most of which provide few specific details and lack adequate
enforcement mechanisms.
(DEIR at 3.2-23 – 3.2-28.) Mitigation measures must be “fully enforceable
through permit
conditions, agreements, or other measures” so “that feasible
mitigation measures will actually be
implemented as a condition of development.” (Federation
of Hillside & Canyon Ass’ns v. City of
Los
Angeles (2000) 83 Cal.App.4th 1252,
1261.) Potential harmful environmental impacts from
the mitigation measures, effectiveness of the mitigation measures
and important specifics on
implementation of the mitigation measures are all missing from the
DEIR. Without the
incorporation of all feasible mitigation measures through permit
conditions, agreements, or other
measures, the DEIR mitigation measures are insufficient and
inadequate.
The DEIR also fails to analyze and adopt all feasible mitigation
measures that would
reduce the admittedly significant air quality impacts of the
Project. In particular, the DEIR fails
to perform even a cursory analysis of available mitigation
measures for reducing air quality
impacts, such as those provided by the California Air Pollution
Control Officer’s Association
and California Office of the Attorney General to reduce GHG
emissions, which also facilitate the
reduction of criteria pollutants. (Attorney General 2010; CAPCOA
2008). Those mitigation
measures, as well as others, should be analyzed as a means to reduce
the significant air quality
impacts and fully adopted if feasible.
For example, MM AQ-1d states that buildings shall implement energy
efficiency
standards that render them 15 percent more efficient than the 2013
Building Standards. (DEIR at
3.2-24.) However, the 2016 Building Standards, which are effective
on January 1, 2017 already
require that buildings are 28 percent more efficient the 2013
Building Standards.3 Thus, MM
AQ-1d is not even as stringent as existing law.
MM AQ 2 similarly will do little to mitigate air pollution or
protect sensitive populations
from health impacts. The DEIR admits that construction emissions
may cause significant
impacts to sensitive receptors, but does not attempt to quantify
these impacts. (DEIR at 3.2-27.)
The DEIR claims that MM AQ 2 – which requires watering of the
construction site – will render
these impacts less than significant. The DEIR fails to cite any
studies or analysis supporting this
conclusion that mere watering will reduce such impacts to less
than significance.
C. The DEIR fails to cite substantial
evidence in claiming that consistency with the
SCAG Regional Transportation Plan renders
the Project consistent with the
AQMP.
The DEIR claims that (1) because the Southern California
Association of Governments’
(“SCAG”) regional growth forecasts are based upon regional land
use plans, then a project that is
consistent with regional land use plans is consistent with SCAG;
(2) if a Project is consistent
with SCAG, then it is consistent with the Air Quality Management
Plan (“AQMP”). (DEIR at
3.2-15 & 3.2-20.) The FEIR fails to cite any authority
supporting the proposition that mere
consistency with regional land use plans equates to consistency
with the AQMP. Even if
compliance with regional land use plans equated to compliance with
the AQMP, the DEIR still is
required to disclose, explain, and analyze such purported
consistency.
3See California Energy
Commission, 2016 Building Energy Efficiency Standards Frequently Asked
Questions,
(available at
http://www.energy.ca.gov/title24/2016standards/rulemaking/documents/2016_Building_Energy_Efficiency_Standar
ds_FAQ.pdf).
V. The DEIR Fails To Adequately Analyze Or
Mitigate The Impacts Of The
Project On Biological Resources.
The DEIR must analyze and mitigation all impacts on special status
species, including
CDFW species of special concern. The CDFW defines a species of
special concern as a species
that, among other things, “is experiencing, or formerly
experienced, serious (noncyclical)
population declines or range retractions (not reversed) that, if
continued or resumed, could
qualify it for State threatened or endangered status.”4 CDFW aims to “achieve
conservation and
recovery of these animals before they meet California Endangered
Species Act criteria for listing
as threatened or endangered.” (Id.) CDFW states that species of special concern
“should be
considered during the environmental review process.” (Id.; CEQA Guidelines § 15380(b)(B).)
An impact to wildlife is significant where it “substantially
reduce[s] the number or restrict[s] the
range of an endangered, rare or threatened species.” (CEQA
Guidelines, § 15065.) CDFW
interprets this provision to apply to species of special concern.
The City must mitigate
significant effects whenever feasible. (Cal. Pub. Res. Code §
21080.5(d)(2)(A).)
The DEIR fails to adequately mitigate impacts to special status
species because it does
not even analyze or disclose those impacts. For example, the DEIR
lists various special status
species that were “not detected during various biological surveys”
even though suitable habitat
occurs the site. (See Table 3.3-3.) The DEIR never explains whether
the surveyors were
searching for these species or whether they were qualified to
identify them. The DEIR even
admits that many of these species have a “high” potential to occur
on the Site; thus, there is a
high potential they inhabit the site even if they were not
observed during a survey.
A. The DEIR fails to disclose, analyze, or
mitigate the Project’s impacts on special
status plant species.
San Diego ambrosia. The DEIR claims that suitable onsite habitat for
the San Diego
ambrosia is “limited,” but concedes that 300 San Diego ambrosia
individuals were mapped on
the central portion of the site. (DEIR 3.3-12.) The DEIR claims
these plants will be
“transferred,” but does not indicate to where they will be
transferred. (DEIR 3.3-36.) This
mitigation measure is therefore impermissibly vague. More
importantly, this mitigation measure
is unenforceable because the DEIR characterizes this translocation
effort as a “voluntarily”
commitment. (DEIR at 2-20.)
Paniculate tarplant. The DEIR reports that Paniculate tarplant were
observed on the
Northern portion of the site, but does not provide any detail on
how many individuals were
observed. (DEIR 3.3-12.) The DEIR claims that impacts will be
“less than significant” even
though the Project will be destroying an unspecified number of
Paniculate tarplant individuals.
((DEIR 3.3-36.) This conclusion is not based upon substantial
evidence because destruction of a
special status species or its habitat qualifies as a significant
impact. Nonetheless, the DEIR
offers absolutely no mitigation measures to limit this impact.
4 See California Dep’t of Fish
& Wildlife, Species of Special Concern (available at
https://www.wildlife.ca.gov/Conservation/SSC/).
The DEIR also lists various special status plants that were “not
found during various
biological surveys.” (See Table 3.3-2.) However, the DEIR does not
indicate whether the
surveyors were looking for these specific types of plants or
qualified to identify them. This is a
serious problem with the DEIR, given that the DEIR concedes that
the site contains suitable
habitat for these special status plants. (See Table 3.3-2.)
B. The DEIR fails to set forth adequate or
enforceable mitigation measures to protect
special status birds.
The DEIR concedes that the Project will have significant impacts
on special status birds
such as Cooper’s hawk, northern harrier, white-tailed kite, and
California horned lark. (DEIR at
(3.3-36.) However, MM-BIO-1 only requires that clearing activities
take place outside of
breeding season “to the extent feasible.” (Id.) As a preliminary matter, the DEIR fails to
state
whether the specified February 1 to September 15 date range is in
fact the breeding season for all
four special status bird species. Moreover, if clearing activities
do take place during breeding
season, the claimed 300-foot construction setback can be altered
to any length decided by a
“qualified biologist.” This does not specify what qualifications a
biologist will have, or whether
the biologist will be an expert on the bird species at issue. Even
these setbacks can be ignored if
“not feasible,” in which case “noise attenuation devices may be
installed . . . .” (DEIR at 3.3-
37.) MM-BIO-1 thus makes every accommodation for the developer if
protection of special
status birds is “not feasible,” but nonetheless comes to the false
conclusion that impacts would be
“less than significant.” More importantly, the broader issue that
the Project will be destroying
the habitat of these birds is never adequately addressed.
Likewise, the DEIR sets forth weak steps to protect the burrowing
owl, even as it admits
that burrowing owls may be killed during construction activities.
(DEIR at 3.3-37.) The DEIR
ignores the fact that the Project would be forever destroying
habitat for the burrowing owl. The
DEIR claims that any burrowing owls onsite will be translocated,
but fails to provide any facts
suggesting that such translocation will be successful. (DEIR at
3.3-38.) In fact, there have been
very few – if any – successful translocation projects for
burrowing owls.
In addition, while translocation could minimize immediate direct
take of burrowing owls,
ultimately the burrowing owls’ available habitat is reduced, and
relocated birds are forced to
compete for resources with other resident burrowing owls and may
move into less suitable
habitat, ultimately resulting in “take.” Additionally, the
mitigation measures needs to explicitly
include long-term monitoring of passively relocated birds in order
to evaluate survivorship of
relocated birds.
The DEIR fails to take any steps to mitigate impacts on the
federally threatened coastal
California gnatcatcher and the yellow warbler, which is a species
of special concern. (Table 3.3-
3.) This constitutes a serious deficiency in the DEIR because both
species have been
documented on the Project Site, and will accordingly suffer
habitat loss if the Project moves
forward.
C. The DEIR fails to set forth adequate or
enforceable mitigation measures to protect
other aquatic species, such as the Western
Pond Turtle.
The DEIR notes the Site’s proximity to Murrieta Creek and the
Santa Margarita River,
but does not contain an adequate discussion of aquatic species
that may inhabit the streams or
adjacent land. For instance, the DEIR only notes in passing the
importance of maintaining water
quality for the Western Pond Turtle (“WPT”). The WPT is never
mentioned in the DEIR again,
even in the section on Riparian/Riverine wildlife. (See DEIR at 3.3-31.) The only mention of
the WPT comes in the MSCHP Consistency Report, which claims that
no WPT or California
red-legged frog (“CRLF”) habitat will be impacted because the
Project “lies entirely outside
Murrieta Creek.” (Appx. C at 34.) This is false because the WPT
regularly occupy areas outside
of creeks, as discussed below.
The WPT uses upland habitat for hibernation and refuge. WPT also
make wide-ranging
use of their aquatic habitat, sometimes migrating more than one
kilometer per year. (Pilliod et al.
at 207.) WPT are listed as species of special concern because
their numbers have decreased due
to increasing habitat destruction and disturbance, especially from
farming operations, and
depredation from invasive species, such as bullfrogs and bass.
(Jennings et al. (1994); Spinks et
al. (2003); Pilliod et al. (2013).) Despite the WPT’s use of both
aquatic and upland habitat –
which would constitute portions of the Project area – the DEIR
fails to analyze, disclose, or
mitigate impacts on WPT.
Similarly, the DEIR claims that no suitable habitat occurs within
the Project area for
CRLF, Arroyo Toad (“AT”), or Mountain Yellow Legged Frog (“MYLF”).
However, the DEIR
does provide any facts, biological opinions, or surveys supporting
this claim. Contrary to the
DEIR, the Federal Register indicates that the Santa Margarita
River and Temecula Creek both
contain critical habitat for the toad.5
D. The DEIR’s other mitigation measures are
vague, unenforceable, and/or illusory.
The DEIR does not set forth adequate mitigation measures to
protect wildlife from
polluted runoff. The DEIR merely states the Project will comply
with applicable NPDES
permits, and that “measures” shall be implemented to avoid
discharge of untreated runoff.
(DEIR at 3.3-32.) This is unenforceable and vague. The DEIR also
does not comply with the
request by the RCA that measures should be implemented to “avoid
discharge of untreated
surface runoff from developed and paved areas into MSHCP
Conservation Areas,” including
Murrieta Creek, Temecula Creek, and the Santa Margarita River.
(RCA Letter at 9.)
Likewise, the DEIR contains no specific mitigation measures to
safeguard wildlife from
toxic chemicals generated by the Project. The DEIR again only
promises that unspecified
“measures” will ensure that toxic chemicals are not discharged
into MSHCP Conservation Areas.
(DEIR at 3.3-32.) The DEIR contains similarly vague mitigation
measures to protect MSHCP
Conservation areas from lighting, noise, and invasive species.
(DEIR at 3.3-33.)
5 See Department of Interior, Endangered
and Threatened Wildlife and Plants; Revised Critical Habitat for the
Arroyo
Toad; Final Rule (Feb. 9, 2011) 76 Fed. Reg.
at 7249, 7264, 7308 (available at
https://www.gpo.gov/fdsys/pkg/FR-2011-02-09/pdf/2011-1703.pdf ).
By the same token, the DEIR vaguely states that “Project impacts”
could result in the
Project being inconsistent with Urban/Wildland Interface
Guidelines, and then lists a variety of
mitigation measures that have limited or no relevance to the
Guidelines. The DEIR should list
each Guideline and explain how the DEIR will be complying with it.
E. Neither the City nor the Applicant
conducted adequate surveys for endangered
species.
The DEIR states that no surveys were conducted for amphibian or
mammal species
because the site is not in a Criteria Area Species Survey Area
(“CASSA”). (DEIR at 3.3-34.)
Whether the site is located in a CASSA is irrelevant to the City’s
duty to ascertain the
environmental baseline under CEQA.
The DEIR further states that various riparian plant species –
including Lemon lily, San
Jacinto Valley crownscale, Mojave tarplant, Parish’s meadowfoam,
Santa Ana River woolly-star,
and Brand’s phacelia – occur outside the site and were not
observed on the site. However, the
DEIR does not provide any information as to whether suitable
habitat exists on the site for these
plant species. In addition, the DEIR does not indicate whether the
surveyors were qualified to
identify these species, or were looking for them. The DEIR
nevertheless discounts the
importance of these species and concludes that “These species are
not discussed further in this
EIR.” (DEIR at 3.3-30.)
F. The DEIR fails to adequately mitigate
impacts on riparian habitat because the City
has not prepared a Determination of
Biological Equivalent or Superior Preservation
(DBESP).
The DEIR states that the Project will “permanently impact” 1.24
acres of
Riparian/Riverine habitat. (DEIR at 3.3-40.) The DEIR does not
specify how these impacts
would be mitigated, except that the Project would prepare a
Determination of Biological
Equivalent or Superior Preservation (“DBESP”) per the MSHCP and a
Habitat Mitigation and
Monitoring Plan if required by CDFW. The DEIR states that specific
mitigation activities – such
as offsite habitat restoration of purchase of credits from a
mitigation bank – would be determined
through “discussions with the City, USFWS, and CDFW.” (DEIR at
3.3-41.) This
impermissibly defers mitigation.
The DEIR similarly claims that MM-BIO-4b would require the
preparation of a DBESP
to address impacts to riparian habitat, but does not specify how
the Project will actually comply
with this DBESP. In particular, MM-BIO-4b states that the DBESP
will include a “written
description of project design features and mitigation measures that
reduce indirect effects” – this
does not provide the public with adequate detail regarding this
proposed mitigation measure, or
explain whether the author of the DBESP has any authority to
require mitigation measures
necessary to keep impacts to less than significant levels.
The City’s refusal to prepare a DBESP is inexcusable because the
RCA already requested
a DBESP two years ago on November 10, 2014. (RCA Letter at 7.) The
RCA also found
various deficiencies with the HELIX’s report; HELIX’s report fails
to (a) provide an “analysis of
the functions and values of the riparian and riverine resources
on-site as required by Section
6.1.2 of the MSHCP” (RCA Letter at 8); (b) analyze the Project’s
impacts on Conserved Habitats
or riparian species listed in section 6.1.2 of the MSHCP, which
include the AT, MYLF, and
CRLF; (RCA Letter at 8); and (c) analyze the “biological
equivalency of the mitigation relative
to the functions and values of the riparian impacts on-site as is
required in a DBESP.” (RCA
Letter at 8.) The RCA concluded that the failure to submit a DBESP
renders the Project
inconsistent with section 6.1.2 of the MSHCP. The Conservation
Groups share the RCA’s
concerns and agree with the RCA’s conclusion.
MM-BIO-4b also defers specifying any ratios for mitigating
riparian habitat and claims
such ratios will be determined during the wetland permitting
process. (DEIR at 3.3-43.)
Similarly, the DEIR does not explain whether any specific
mitigation measures will be
implemented to protect onsite wetlands, and instead refers back to
MM-BIO-4a and MM-BIO-
4b, and generally states that a section 404 permit will be
required.
G. The DEIR fails to adequately mitigate
impacts on sensitive natural communities.
The DEIR claims that impacts on sensitive natural communities will
be mitigated to less
than significant because the developer will be mitigation fees as
determined by the City and the
Project will “conserve” at least 82.77 acres in Criteria Cells.
(DEIR at 3.3-45.) However, there
is no evidence in the record indicating that this paltry amount of
“conservation” will mitigate the
extensive impacts of installing hundreds of houses on undeveloped
land.
VI. The Project Will Severely Constrict
Wildlife Corridors And Interfere With
Mountain Lion Movement.
Dr. Winston Vickers – a well-known mountain lion expert – has
already repeatedly
informed the City of the serious impacts on mountain lion movement
of the Project as proposed.
He sent you an email on November 6, 2014, and wrote:
I wanted to write to make sure that my professional opinion
relating to the proposed
Altair development is clear to all the parties. . . . the
development is highly likely to
reduce use of the escarpment by mountain lions. Adult
resident males and adult females
without
kittens are expected to be negatively impacted to the greatest degree
(significantly
reduce use or stop using, especially certain behaviors), with similar
negative
impacts also expected for females with kittens and young dispersing animals
but to a lesser degree than for adult males and females without
kittens. Nevertheless,
significantly reduced use is expected for a distance of a [sic]
least 150 meters from the
development for all classes, and for the entire escarpment for
some.
Development
of the southernmost pad area is expected to have the most negative
impact, especially on mountain lion use of the
escarpment just north of Temecula Creek
and Murrieta Creek. Movement in Temecula Creek toward the Temecula
Creek bridge
beneath 1-15 may also be negatively impacted by development at the
southern-most site.
Since this bridge is the only currently (possibly) functional safe
passage under 1-15 for
mountain lions that is likely to allow introduction of critically
needed fresh genetic
material into the Santa Ana mountain lion population (and genetic
exchange the other
direction), any further reduction in its potential
functionality is unwise at best….
The CDFW wrote separately to you on December 15, 2014 to reiterate
the concerns expressed in
Mr. Vicker’s email. (See DEIR, Appx. A at PDF p. 80.) CDFW further stated
that it expected
the City to consult with Mr. Vickers. (Id.).
The DEIR’s conclusions regarding mountain lion movement are not
supported by
substantial evidence. The DEIR cites a study published by Dr.
Vickers which found that
impermeable barriers to mountain lion movements result in genetic
restriction and demographic
isolation of mountain lions. (DEIR at 3.3-47.) The DEIR concedes
that both Dr. Vickers and
HELIX anticipate reduction in overall suitable of Proposed Linkage
10 due to reduction in
linkage width, and that reproductive behaviors would be most
negatively impacted, or possibly
eliminated. (DEIR at 3.3-49 & 50.) Nonetheless, the DEIR
concludes that the Project would not
preclude use of the Proposed Linkage 10. (DEIR at 3.3-52.)
The only support for this “not preclude” finding is HELIX’s
“corridor” model. Yet,
Figure 3.3-4 shows heavy use by mountain lions of the Project
Site, as well as Linkages 10, 13,
and 14. The utility of HELIX’s corridor model is unclear, given
that substantial data already
exists which demonstrates that these areas are in fact used by
mountain lions. The utility of
HELIX’s model further is questionable because the model presumes
habitat suitability and
habitat permeability are synonymous, even though they are not.
(DEIR at 3.3-48.) In addition,
the HELIX model does not determine whether a linkage is “viable,”
but merely where the “best
locations are” based on the model. (DEIR at 3.3-48.) The
conclusions of the HELIX study and
model also should be rejected because none of the authors have
demonstrated that they have any
expertise or experience in studying mountain lions.
The need to preserve the existing wildlife corridors is
particularly great in light of the
threats that the Santa Ana mountain lions are facing. A
peer-reviewed study co-authored by Dr.
Vickers concluded that Santa Ana mountain lions have some of the
lowest genetic diversity of all
mountain lions in California. (Ernest et al. (2014).) The study
warned that connectivity between
the Santa Ana range and inland ranges may continue to be eroded by
development near the I-15
corridor. (Id.) The genetic diversity of the Santa Ana mountain lions will be
further eroded if
this Project moves forward, which may lead to the extinction of
this population. The Santa
Monica mountain lions are already facing imminent extinction
because development frustrates
their ability to maintain movement and genetic diversity.6
None of the proposed mitigation measures will ensure that mountain
lions are able to
continue to use the wildlife corridors in Linkages 10, 13, and 14.
For example, MM-BIO-3
prohibits the collection of plants and feeding of wildlife, and
requires daily trash removal and
limiting construction equipment idling to 45 minutes. (MM-Bio-3.)
Even if these measures are
strictly complied with, they do not address the fact that the
Project will bring intensive
development into a wildlife corridor.
6 See Los Angeles Times, “L.A.’s mountain lions could be near extinction in 50 years”
(Aug. 31, 2015) (available at
http://www.latimes.com/science/sciencenow/la-sci-sn-mountain-lions-threat-20160830-snap-story.html).
MM-BIO-7b is unlikely to adequately protect mountain lions and
other wildlife. MMBIO-
7b states that permanent fencing along the Western Bypass will
keep animals within the
wildlife corridor. (DEIR at 3.3-53.) However, the fencing plan has
yet been developed, and
there is no evidence in the DEIR that the fence will be tall
enough to protect mountain lions from
jumping over it. The City should require that a fencing system
which is similar to the system
installed on the 241 toll road be used on the Western Bypass – the
241 toll road fencing is 10 to
12 feet high and runs two feet into the ground to prevent mountain
lions from digging under it.
The fencing should also have exit points and ramps in the event
that mountain lions do find
themselves on the Western Bypass.
By siting intensive development in a wildlife corridor used by
mountain lions, the Project
will result in conflicts between mountain lions and people. Such
conflicts often result in the
killing of mountain lions, which will further reduce the genetic
diversity of mountain lions in the
area.
VII. The Project Cannot Be Approved Because
The Wildlife Agencies Have
Concluded That This Project Will Violate
The MSHCP.
The Project should be rejected by the City because the RCA, USFWS,
and CDFW all
agree that the Project will violate the MSHCP. The Project will
significantly interfere with the
functionality of MSHCP linkages and therefore frustrate movement
of wildlife, including
mountain lions.
A. The RCA has concluded that the Project
will violate the MSHCP.
On April 1, 2015, the RCA sent detailed comments to the City on
the Project as part of
the Joint Project Review (“JPR”) process (the “RCA Letter”). The
RCA issued the following
conclusions regarding the Project:
The Project would preclude
Cell Criteria for Cell 7164 from being met by making
it impossible to conserve the mid-point amount of 120 acres on the
cell. (RCA
Letter at 3.)
The Project would preclude
Cell Criteria for Cell 7166 from being met by
impacting all remaining acreage available for conservation. (RCA
Letter at 3.)
The Project would preclude
Cell Criteria for Cell 7264 and Proposed Linkage 10
by conserving far less than the mid-point amount of 120 acres on
the cell. (RCA
Letter at 4.)
The Project would encroach
into the negative zone of influence for mountain lion
movement – which is one the primary objectives of Cell 7355 and
Proposed
Linkage 10 – such that it is in conflict with reserve assembly
goals. (RCA Letter
at 4.)
The Project would preclude
the ability to meet the target conservation range for
Cell 7356 of 88 acres. (RCA Letter at 5.) The RCA Letter further
notes that the
City should analyze the cumulative impacts of the I-15/State Route
79 South
interchange, but the City has failed to do this. (See id.)
15
Proposed Linkage 10 was
intended to provide linkage for movement of bobcats
and mountain lions, as well as live-in habitat for them. The
Project will
significantly reduce the viability of Proposed Linkage 10 for
these purposes by
reducing the width of Proposal Linkage 10 from 1200 to 2700 feet
to less than
500 feet.
The RCA further concluded that (a) the reduction in Proposed
Linkage 10 was “particularly
critical” because of the concentrated mountain lion use at the
southern end of the Project at the
confluence of Temecula Creek, Murrieta Creek, and the Santa
Margarita River (RCA Letter at
6); (b) the City’s plan to offer MSHCP fee credits to the
Applicant in exchange for 270 acres of
offsite land is an “inappropriate use of MSHCP fee credits” since
these credits are designed for
onsite conservation (RCA Letter at 7); (c) the Project must be
conditioned upon fencing of
proposed Conservation Areas, and the fencing plan must be reviewed
and approved by RCA,
USFWS and the CDFW.
The RCA’s determinations are entitled to deference because, as the
DEIR notes, the RCA
oversees, administers, and enforces the MSHCP. (DEIR at 3.3-10.)
The DEIR claims that the
RCA has no authority to prevent the City – a permittee of the
MSHCP – from approving a
discretionary project. (DEIR at 3.3-10.) While this may be true,
failure to comply with the
MSHCP means that the City is violating the Federal Endangered
Species Act, and – by extension
– CEQA.
B. USFWS and CDFW have concluded that the
Project violates the MSHCP.
In a joint letter to the City dated April 15, 2015 (the “USFWS
Letter”), USFWS and
CDFW informed the City that that they concurred with the RCA’s
conclusion: “The Wildlife
Agencies
concur with the RCA's determination and consider the project to be inconsistent
with
the
MSHCP criteria for reserve
assembly in terms of both area and function. (USFWS Letter at
1.) The USFWS Letter further explains how the Project will degrade
biological connectivity
between Proposed Linkage 10 and Constrained Linkage 14 and
preclude MSHCP reserve
assembly goals. (USFWS Letter at 2.) Proposed Linkage 10 would be
narrowed to 600 feet,
which is not sufficient to provide movement for mountain lions and
bobcats. (Id. at 2.)
Like Dr. Vickers and the RCA, the USFWS Letter contradicts the
conclusions of the
Applicant’s consultant, HELIX. In particular, HELIX ignored
existing development in analyzing
acreage goals for each Criteria Cell and improperly implied that
the reserve assembly criteria can
be discounted merely because the Western Bypass is a Covered
Activity. (USFWS Letter at 2.)
And while the HELIX acknowledges that the Project will inhibit the
intended reserve functions,
HELIX somehow arrives at the contradictory conclusion that the
Project is consistent with
reserve assembly and connectivity needs. (See USFWS Letter at 2.)
USFWS and CDFW also disagree with HELIX’s legal interpretation of
MSHCP
requirements. While USFWS and CDFW note that the Project would
result in a reserve
assembly shortfall of approximately 200 acres (USFWS Letter at 3),
HELIX and the Applicant
have concluded that “acreage requirements are not the only
criteria used when determining
overall consistency with the MSHCP.” (See DEIR, Appx. C at 44.) USFWS and CDFW
rejected this conclusion, and clarified that “the other MSHCP elements
are additive to the
acreage
requirements not substitutes for them.” (USFWS Letter at 3, emphasis added.) In
other words, neither the City nor the Applicant may evade acreage
requirements by claiming that
they are fulfilling other MSHCP-related goals. The City and
Applicant’s efforts to do so violate
the law.
USFWS and CDFW further concurred with RCA that the Applicant’s
proposed
conservation of 270 acres near Corona (which the Applicant has
claimed is “voluntary”) will not
address the target acreage shortfalls in Subunits 1 and 6. (USFWS
Letter at 3.) Moreover, the
City’s attempts to offset the Applicant’s purchase costs with
MSHCP credits violates the
MSHCP. (Id. at 3.)
USFWS and CDFW note in their letter that they already discussed
the conflicts with the
MSHCP at multiple meetings with the City and “expressed strong
reservations” about the
Project. Incredibly, the City and the Applicant have ignored the
USFWS and CFDW’s
conclusions, and are attempting to move forward with the Project
as proposed. Given that all of
the relevant agencies have already concluded that this Project
violates the MSHCP, the City’s
self-serving interpretation of the MSHCP is not supported by
substantial evidence.
VIII. The DEIR Fails To Demonstrate
Consistency With The MSHCP.
In addition to the mountain lion movement issues discussed above,
the DEIR violates the
MSHCP in a myriad of other ways. As a preliminary matter, the DEIR
states that compliance
with the MSHCP provides assurances that the Project is in
compliance with the Federal ESA and
CEQA. (DEIR at 3.3-58.) By the same token, non-compliance with the
MSHCP indicates noncompliance with the FESA and Federal ESA and CEQA.
The Project accordingly violates both the Federal ESA and CEQA for
the reasons set
forth below:
A. The DEIR does not cite facts, evidence,
or analysis for its conclusion that the Project
is consistent with the MSHCP.
The DEIR repeatedly claims consistency with the MSHCP, but fails
to offer any real
analysis or facts supporting this claim. For example, the DEIR
claims that the significant
impacts on Proposed Linkage 10 and Proposed Constrained Linkage 13
will be mitigated by light
and glare standards, fencing, conservation of land, and adherence
to noise standards. (DEIR at
3.3-62.) The DEIR does not cite any evidence supporting this
claim, and the analysis of CDFW,
USFWS, RCA, and Dr. Vickers cited above directly contradict this
claim.
The DEIR claims that the Project is consistent with the MSHCP even
though the DEIR
concedes that the Project fails to meet specific Criteria Cell
acreage goals. (DEIR at 3.3-64.)
The DEIR notes that the RCA has concluded that the Project is inconsistent
with the MSHCP.
(Id.) Nonetheless, the DEIR
claims that in light of the “broader analysis set forth above,” the
Project is consistent with the MSHCP. This claim is not based upon
substantial evidence.
The DEIR admits that the Project will have an onsite shortfall of
served acres for impacts
to riparian and grassland habitat, and states that these impacts
are significant such that mitigation
is required. (DEIR at 3.3-59.) The DEIR then states that
MM-BIO-4a, MM-BIO-4b, MM-BIO-
6a, and MM-BIO-6a will mitigate these impacts. (Ibid.) Yet, none of these mitigation measures
has anything to do with mitigating grassland habitat, such that it
is difficult to ascertain how they
could mitigate impacts to less than significant levels.
B. The Project fails to comply with the
MSHCP Planned Roadway Criteria Guidelines.
The DEIR incorrectly asserts that the Project is consistent with
MSHCP Planned
Roadway Criteria Guidelines. (DEIR at 3.3-64.) However, the DEIR
concedes that the Western
Bypass associated with the Project will result in impacts to
wetlands, southern willow scrub, and
other habitats. (DEIR at 3.3-65.) The DEIR lists percentages next
to the acreage of each
impacts, but does not explain what these percentages refer to. The
DEIR also does not explain
why it was infeasible to avoid these sensitive areas. (Id.)
In addition, the Project does not appear to be consistent with
MSHCP Planned Roadway
Criteria for endemic plant species. The MSHCP states that narrow
endemic plant species will be
avoided, and if not feasible, then the Project will comply with
the Narrow Endemics Plant
Policy. The DEIR merely states that San Diego ambrosia will be “voluntarily”
be translocated.
(DEIR at 3.3-65.) The DEIR’s claim that such translocation is
“voluntary” is misleading because
such relocation is mandatory, not voluntary. In addition, the DEIR
fails to provide any
explanation as to how the Project will be complying with the
Narrow Endemics Plant Policy.
The DEIR’s position also appears to conflict with USFWS and CDFW’s
direction that the
population of San Diego ambrosia supported on Criteria Cell 7166
must be conserved.
The Project fails to comply with the MSHCP Planned Roadway
Criteria Guideline for
breeding season. The Guidelines provide, “Any construction,
maintenance and operation
activities that involves clearing of natural vegetation will be
conducted outside the active
breeding season (March 1 through June 30).” In contrast, the DEIR
only promises that this
condition will be complied with “to the extent feasible,” and
provides no explanation as to what
constitutes “feasibility.” (DEIR at 3.3-66.) The DEIR accordingly
does not assure compliance
with this Guideline.
IX. The DEIR Fails To Adequately Analyze,
Disclose, And Mitigate The Project’s
Greenhouse Gas Emissions.
The Project will undisputedly result in substantial greenhouse gas
(“GHG”) emissions.
The DEIR concedes that the Project’s 24,953 MTCO2e of GHG
emissions would exceed the
SCAQMD threshold of significance, and claims that these impacts
would be significant and
unavoidable. (DEIR at 3.6-15.) It is unclear, however, whether the
24,953 MTCO2e figure is
accurate, as the source of the figure is not described; Table
3.6-2 opaquely lists the “source” as
“ESA, 2015.” (DEIR at 3.6-15.) The EIR should provide a detailed
explanation for the 24,953
MTCO2e figure.
A. The DEIR improperly relies upon the
discredited “business as usual” methodology.
The Project’s GHG emissions impacts analysis impermissibly relies
upon the “business
as usual” or “BAU” method. When the California Air Pollution
Control Officers Association
(“CAPCOA”) issued a “CEQA & Climate Change” white paper
intended to serve as a resource
to assist lead agencies in analyzing GHG impacts under CEQA,
CAPCOA determined that
significance analysis relying on reductions from project
business-as-usual emissions, had “low”
GHG emission reduction effectiveness and consistency with state
emission reduction targets.
(CAPCOA 2008.) Similarly, the California Resources Agency
cautioned against using the
Scoping Plan’s “business as usual” objective to determine
significance under CEQA in its Final
Statement of Reasons. The Resources Agency specifically warned
that “a comparison of the
project against a ‘business as usual’ scenario as defined by
[CARB] in the Scoping Plan . . .
would confuse ‘business as usual’ projections used in [CARB’s]
Scoping Plan with CEQA’s
separate requirement of analyzing project effects in comparison to
the environmental baseline.”7
Additionally, the Attorney General has argued that because the
“business as usual”
approach “would award emission reduction ‘points’ for undertaking
mitigation measures that are
already required by local or state law,” it results in
“significant lost opportunities” to require
meaningful mitigation. (See Letter from California Attorney General to
SJVACD re: Final Draft
Staff Report on Greenhouse Gas Emissions Under CEQA at 1, 3 (Nov.
4, 2009).) The analysis
done in the DEIR flies in the face of the findings in the Scoping
Plan, which recognize that local
governments “are essential partners” in achieving California’s
emissions reduction goals, further
highlighting the lack of legitimacy of the DEIR’s significance
criteria. (Scoping Plan at 26; see
also
Californians for Alternatives to Toxics v. Dept. of Food & Agric. (2005) 136 Cal.App.4th 1,
17 (compliance with existing environmental laws or regulations is
not sufficient to support a
finding that a project will not have significant environmental
impacts) [hereinafter
“Californians”].)
Moreover, the DEIR’s approach is not consistent with Center
for Biological Diversity v.
Department
of Fish & Wildlife (2015) 62
Cal.4th 204 (hereinafter “Newhall”). Newhall held that
the EIR must set forth substantial evidence that the project’s
“project-level” emissions reductions
are consistent with achieving the state-wide goal of a 29 percent
reduction from business as
usual. (Id. at 225.) Newhall
further explained that reductions
based on “business-as-usual”
comparisons do not comply with CEQA unless they are supported by
substantial evidence on
how the individual project, in its location supports
of finding of less than significant.
Accordingly, in order to adequately analyze GHG emissions under
CEQA, the DEIR must
include information and analysis how this
Project’s emissions fits in with
local, regional and
state level targets before making its less than significance
finding. Moreover, while the
significance threshold and analysis may have been based in part of
existing thresholds,
compliance with the law is not enough to make a finding of less
than significant under CEQA.
(See Protect the Historic Amador Waterways v. Amador Water Agency (2004) 116 Cal. App. 4th
1099, 1107.) Instead “the EIR’s discussion of impacts must
“provide[] sufficient information
and analysis to allow the public to discern the basis for the
agency’s impact findings. Thus the
7 See California Natural
Resources Agency, “Final Statement of Reasons for Regulatory Action” (Dec.
2009)
(available at http://resources.ca.gov/ceqa/docs/Final_Statement_of_Reasons.pdf).
EIR should set forth specific data, as needed to meaningfully
assess whether the proposed
activities would result in significant impacts.” (Sierra
Club v. Tahoe Reg’l Planning Agency
(2013) 916 F. Supp. 2d 1098, 1146-1147 (Sierra
Club).)
The DEIR does not contain an adequate analysis of this issue. For
instance, the DEIR
does not adequately explain why greater emissions reductions are
not required for the Project,
given that designing new buildings and infrastructure for maximum
energy efficiency and
renewable energy use is easier than achieving the same savings
from older structures. (See
Newhall, 62 Cal.4th 204, 226.)
B. The DEIR Fails to adopt any meaningful
mitigation measures to reduce the
Project’s GHG emissions.
Mitigation of a project’s environmental impacts is one of the
“most important” functions
of CEQA. (Sierra Club v. Gilroy City Council (1990) 222 Cal.App.3d 30, 41.) Therefore, it is
the “policy of the state that public agencies should not approve
projects as proposed if there are
feasible alternatives or feasible mitigation measures which will
avoid or substantially lessen the
significant environmental effects of such projects.” (Pub. Res.
Code § 21002.)
Although the DEIR includes a curtailed list of measures directed
at reducing emissions
and promoting sustainability, these strategies are severely
limited and do not include adequate
mitigation measures. The meager steps incorporated into the
Project do not include effective
enforcement mechanisms and omit many feasible mitigation measures
completely. Except for
assuming that new technology will reduce emissions in the future,
the DEIR does nothing to
explain or analyze how the Project will meet future reduction
targets.
For example, MM-GHG-1 states that the applicant will apply for
LEED certification;
however, the applicant “will be deemed to have exercised best
efforts to achieve full certification
even
if certification is denied,
and “no further action” would then be required. (DEIR at 3.6-18;
S-19.) The DEIR also proposes to “mitigate” GHG emissions through
prohibiting fireplaces,
requiring low VOC cleaning supplies, and including an option for
onsite renewable energy such
that a mere 9% of onsite energy consumption is “offset.” (DEIR at
S-19, 3.2-23, 3.2-24.) These
limited mitigation measures will not mitigate the Project’s GHG
impacts, and the DEIR fails to
demonstrate that stronger mitigation measures are not feasible.
The DEIR similarly claims that the proposed mitigation measures
will ensure that the
Project does not conflict with applicable plans for reducing GHG
emissions. (DEIR at 3.6-19.)
Yet, the DEIR only provides general details regarding these plans
– such as the CARB Scoping
Plan and Temecula Sustainability Plan – and does not explain how
the Project is actually
consistent with these plans. (See Newhall, 62 Cal.4th 204, 225.)
C. The DEIR should include further
mitigation measures to reduce the Project’s
energy demands and increase use of
renewable energy onsite.
Mitigation measures to reduce vehicle miles traveled, energy use,
waste, water
consumption as well as use of solar power could lower the Project’s
impact on climate change
(as well as air pollution and water use). CAPCOA has identified
existing and potential
mitigation measures that could be applied to projects during the
CEQA process to reduce a
project’s GHG emissions. (CAPCOA 2008). The California Office of
the Attorney General also
has developed a list of reduction mechanisms to be incorporated
through the CEQA process.
(CAPCOA 2008 at Table 16.) These resources provide a rich and
varied array of mitigation
measures to be incorporated into the Project. Potential mitigation
measures include ease of
access to public transit, alternative construction materials, and
onsite energy generation, as
discussed below:
In general, the EIR should consider mitigation measures that will
ensure the planned
community will use energy efficiently and conservatively. In doing
so, it should analyze
incorporating “green building” in the development. Green buildings
are those buildings that
lower energy consumption, use renewable energy, conserve water,
harness natural light and
ventilation, use environmentally friendly materials and minimize
waste. (Commission for
Environmental Cooperation 2008.)
Buildings create environmental impacts throughout their lifecycle,
from the construction
phase to their actual use to their eventual destruction.
(Commission for Environmental
Cooperation 2008.) In the United States, buildings account for 40
percent of total energy use, 68
percent of total electricity consumption, and 60 percent of total
non-industrial waste.
(Commission for Environmental Cooperation 2008.) Buildings also
significantly contribute to
the release of greenhouse gases. In the U.S. they account for 38
percent of total carbon dioxide
emissions. (Commission for Environmental Cooperation 2008.) More
specifically, residential
buildings cause up to 1,210 megatons of carbon dioxide, while commercial
buildings create
approximately 1,020 megatons. (Commission for Environmental
Cooperation 2008.) This is
because buildings require a lot of energy for their day to day
operations. Most of the coal-fired
power plants – one of the biggest sources of GHG emissions –
slated for development in the
United States will supply buildings with the energy they need. In
fact, 76 percent of the energy
these plants produce will go to operating buildings in the U.S.
(Commission for Environmental
Cooperation 2008.)
Using green building techniques, however, can substantially reduce
buildings’ influence
in increasing GHG emissions. Green buildings help reduce the
amount of energy used to light,
heat, cool and operate buildings and substitute carbon-based
energy sources with alternatives that
do not result in GHG emissions. (Commission for Environmental
Cooperation 2008.) Currently
green buildings can reduce energy by 30 percent or more and carbon
emissions by 35 percent.
(Commission for Environmental Cooperation 2008.) The technologies
available for green
building are already in wide-use and include “passive solar
design, high-efficiency lighting and
appliances, highly efficient ventilation and cooling systems,
solar water heaters, insulation
materials and techniques, high-reflectivity building materials and
multiple glazing.
Specific mitigation measures for the GHG emissions generated by
the Project’s energy
consumption include, but are not limited to:
Requiring that the
Applicant seek and obtain the U.S. Green Building Council’s LEED
or comparable standards for energy- and resource efficient
building during pre-design,
design, construction, operations and management;
Designing buildings for
passive heating and cooling, and natural light, including building
orientation, proper orientation and placement of windows,
overhangs, skylights, etc.;
Designing buildings for
maximum energy efficiency including the maximum possible
insulation, use of compact florescent or other low-energy
lighting, use of energy efficient
appliances, etc.;
Reducing the use of
pavement and impermeable surfaces;
Requiring water re-use
systems;
Installing light emitting
diodes (LEDs) for traffic, street and other outdoor lighting
Limiting the hours of
operation of outdoor lighting;
Maximizing water
conservation measures in buildings and landscaping, using drought
tolerant plants in lieu of turf, planting shade trees;
Ensure that the Project is
fully served by full recycling and composting services;
Ensure that the Project’s
wastewater and solid waste will be treated in facilities where
GHG emissions are minimized and captured;
Installing the maximum
possible photovoltaic array on the building roofs and/or on the
project site to generate all of the electricity required by the
Project, and utilizing wind
energy to the extent necessary and feasible;
Installing solar water
heating systems to generate all of the Project’s hot water
requirements;
Installing solar or wind
powered electric vehicle and plug-in hybrid vehicle charging
stations to reduce emissions from vehicle trips;
The Project should further utilize the following mitigation
measures related to construction:
Utilize recycled,
low-carbon, and otherwise climate-friendly building materials such as
salvaged and recycled-content materials for building, hard
surfaces, and non-plant
landscaping materials;
Minimize, reuse, and
recycle construction-related waste;
Minimize grading,
earth-moving, and other energy-intensive construction practices;
Landscape to preserve
natural vegetation and maintain watershed integrity;
Utilize alternative fuels
in construction equipment and require construction equipment to
utilize the best available technology to reduce emissions.
Rooftop solar power is the most energy efficient,
least-environmentally damaging form
of renewable energy available for the Project and is ideal for the
Project’s location. Nonetheless,
the Project proposes only limited onsite solar energy. The Conservation
Groups urge that on-site
renewable energy be used to meet at least 75 percent of the
Project’s energy use. All other
emissions should be reduced to extent possible, offset on-site and
if that is not possible, offset
using off-site mitigation. New construction, like this Project,
has a unique opportunity to fully
embrace and incorporate the use of renewable energy in its design,
construction and operation.
We urge the City to take full advantage of those opportunities, if
it chooses to move forward with
the Project.
X. The DEIR Fails To Disclose Or Analyze
The Environmental Impacts Of The
Project’s Fuel Modification Plans.
The DEIR states that the Project is “near” a “High Fire Hazard
Area,” but never discloses
where this area is in relation to the Project. This fails to
inform the public as to the fire dangers
associated with the Project.
MM-HAZ-1 states that the applicant will prepare a “fuel
modification plan” prior to
issuance of building permits. According to the County’s Fire
Department, fuel modification
plans involve replacing native plants with drought resistant
alternatives.8 As such, it is
reasonable to assume that these fuel modification plans would
result in significant impacts on
plants, wildlife, and other biological resources. Nonetheless, the
DEIR does not provide any
information regarding the specifics of these fuel modification
plans, nor does the DEIR analyze
the environmental impacts on biological resources of implementing
these plans.
The DEIR should include areas impacted by fuel modification plans
as part of the
development “footprint” of the Project, and be analyzed as such.
Moreover, no fire
clearance/thinning activities should occur within the boundaries
of any federally designated
critical habitat, open-space, natural area or wildlife movement
corridor. Finally, fuel
modification plans must ensure that no invasive species are
planted as part of the plans.
XI. The DEIR’s Analysis Of The Project’s
Impacts On Water Quality Is Flawed.
The Project will likely result in substantial impairment of the
water quality in Murrieta
Creek, as well as Temecula Creek and the Santa Margarita River.
The DEIR explains that the
Project will cause untreated runoff to flow from the Project site
directly into Murrieta Creek.
Untreated runoff often contains toxic metals, grease, trash, and
other substances that are harmful
to water quality and wildlife. Such dumping of untreated runoff is
unacceptable, especially
given that Murrieta Creek already is an impaired waterbody. While
the DEIR claims that runoff
from “developed” portions of the site would be treated, the DEIR
provides no detail which
portions of the site will be considered “developed” or what types
of treatment the stormwater
will undergo. The DEIR also is unclear as to what extent runoff
will discharge directly into
Murrieta Creek – on the one hand, it claims that runoff from the
development will be “treated,”
but also states that “the majority of the project discharges directly
into Murrieta Creek…” (DEIR
at 3.8-19.)
The DEIR does not include sufficient data regarding existing water
quality conditions to
provide adequate baseline information from which to assess Project
impacts on local and
regional water quality. All that is provided in the DEIR is a list
of substances for which the
Murrieta Creek is impaired under section 303(d) of the Clean Water
Act. (DEIR 3.8-3.) The
DEIR does not provide information regarding any other substances,
or provide adequate water
quality information regarding Temecula Creek and the Santa
Margarita River, which also are
8 Riverside County Fire
Department Fire Protection Planning Section, “Information Bulletin,” (April 8,
2008)
(available at
http://www.rvcfire.org/stationsAndFunctions/AdminSppt/FireMarshal/Documents/Informational%20Bulletins/IB_0
8-05_Fuel_Modification_Rev_1.pdf).
adjacent to the Project site. Without this data, the DEIR fails to
provide sufficient baseline
information that would allow the public to evaluate significant
adverse impacts the Plan will
have on the environment. (CEQA Guidelines § 15125(a); Communities
for a Better Environment
v.
South Coast Air Quality Management District (2010) 48 Cal.App.4th 310, 315[hereinafter
CBE
SCAQMD].)
The DEIR also understates the impacts on water quality of the
Project. For instance, the
DEIR concludes that runoff patterns during and prior to
construction will be the same. (DEIR at
3.8-18.) This claim is not credible because intensive grading of
the site is very likely to change
runoff patterns; the DEIR later admits that the Project’s grading
activities will require four
million cubic yards of cut and fill. (DEIR at 3.8-29.)
The mitigation measures proposed in the DEIR are not described in
sufficient detail to
ascertain whether they will be effective. The DEIR states that
“BMPs” have been proven
effective in reducing construction runoff, such that impacts would
be less than significant. This
is not an adequate analysis; the types of BMPs that the Project
will utilize are not disclosed, nor
is the effectiveness of the BMPs. This is a serious inadequacy in
the DEIR given the Project’s
close proximity to three different streams – Murrieta Creek,
Temecula Creek, and the Santa
Margarita River, all of which are home to aquatic wildlife.
The “mitigation” measures set forth in the DEIR impermissibly
defer actual development
of the mitigation measures. MM HYD-1 states that a drainage study
will be prepared and will
verify capacity of existing drainage facilities. (DEIR at 3.8-19.)
Deferring this study until after
the environmental review process is completed leaves the public in
the dark regarding the true
impacts of the Project, and violates CEQA. Even after this study
is conducted, there is nothing
in the DEIR that requires the developer to take steps to follow
the recommendations of the study.
Instead, if the study determines that facilities receiving
stormwater are insufficient, then “onsite
detention would be considered.” (DEIR at 3.8-20.) CEQA requires
that mitigation measures
legally enforceable, not just “considered.” MM-HYD-3 also defers
development of the Project’s
Water Quality Management Plan because the Applicant is not
required to submit the Plan until
immediately prior to issuance of building or grading permits.
(DEIR at 3.8-28.)
Furthermore, the DEIR claims that stormwater runoff would not
cause a significant
impact because MM-HYD-1 requires compliance with the MS4 permit.
Such promises are not
sufficient to demonstrate that the Project will not have a
significant impact. (See Californians,
136 Cal.App.4th at 17 (compliance with existing environmental laws
or regulations is not
sufficient to support a finding that a project will not have
significant environmental impacts).)
Likewise, MM-HYD-2 and MM-HYD-3 – which require compliance with a
SWPPP,
“potential” BMPs, and the MS4 permit – will purportedly render impacts
less than significant.
(DEIR 3.8-21, Table 3.8-5, 3.8-26.) The Project must already
comply with these regulations
such that these “mitigation” measures are not additional to
actions already required by the
Applicant and the City. The purpose of the EIR is not just to
explain how the Project will
comply with existing laws; the EIR must disclose the Project’s
specific environmental impacts,
and explain how these impacts will be mitigated. The DEIR fails to
do this.
XII. The DEIR Fails To Accurately Disclose
The Project’s Impacts On Water Supply.
The DEIR is the correct place to raise issues regarding adequacy
of water supply under
CEQA, and the proper occasion for decisionmakers and members of
the public to challenge
conclusions contained in a water district’s Water Supply
Assessment (“WSA”). (See California
Water
Impact Network v. Newhall County Water District (2008) 161 Cal.App.4th 1464, 1488
(“The lead agency has a separate and independent responsibility to
assess the sufficiency of
water supplies for the proposed project.”).)
The DEIR does not adequately analyze the impacts of the Project on
water supply. On
the one hand, the DEIR acknowledges that the local water agency
has issued an “Extreme Water
Supply Warning” which requires substantial cutbacks in water
usage. (DEIR at 3.14-14.) On the
other hand, the DEIR myopically claims that adding over 4,000
people to a City of
approximately 100,000 (a 4 percent increase in population) will
have no significant impact on
water supplies.
The DEIR indicates that groundwater recharge and “local
groundwater” will substantially
contribute to the water supplies for the Project. (Table at 3.14-5
and Table 3.14-1.) Yet, there is
no analysis in the DEIR as to whether the groundwater basin can
sustain continued pumping,
especially in the event of prolonged droughts, which will become
more common as the impacts
of climate change intensify.
Furthermore, the DEIR’s water supply analysis does not adequately
plan for the
possibility that the state and regional water agencies will
curtail water deliveries to the Rancho
California Water District (“RCWD”), which provides water to the
City and its residents. As the
WSA admits, the Project will rely upon water deliveries from the
State Water Project, Colorado
River, and groundwater, including through the Metropolitan Water
District of Southern
California (“MWD”). (DEIR, Appx. J at ES-5.) As the WSA further
admits, MWD recently
reduced water deliveries to RCWD by 15 percent. (DEIR, Appx. J at
ES-10.) It is possible that
MWD could further reduce water deliveries, or that the State Water
Project could reduce or
entirely eliminate water deliveries. Nonetheless, there is no
discussion in the DEIR or WSA as
to whether adequate water supplies exist for the Project in the
event that MWD or other agencies
further reduce water supply deliveries to RCWD.
At a time when Temecula residents are subject to mandatory
reductions in water usage, it
is unfortunate that the City is pushing forward with a Project
that will force Temecula residents
to share their limited water allocations with thousands of
additional residents.
XIII. The DEIR Fails To Adequately Assess
Or Mitigate The Project’s Noise Impacts.
The DEIR is required to analyze whether the energy conservation
mitigation measures in
Appendix F of the CEQA Guidelines could be adopted as part of the
Project. (See California
Clean
Energy Committee v. City of Woodland (2014) 225 Cal.App.4th 173, 209 (an EIR is
defective when it fails to include a detailed statement setting
forth the mitigation measures
proposed to reduce wasteful, inefficient, and unnecessary
consumption of energy in accordance
with Appendix F of the CEQA Guidelines) [hereinafter “CCEC”].) Nonetheless, the DEIR fails
to include any mention or analysis of the conservation mitigation
measures in Appendix F of the
CEQA Guidelines.
The DEIR also fails to adequately describe the transportation
energy impacts of the
Project. (See Ukiah Citizens for Safety First v.
City of Ukiah (2016) 248 Cal. App. 4th
256, 264
(EIR invalid because it failed to disclose the transportation
energy impacts of vehicle trips
generated by the project).)
Perhaps most importantly, Appendix F of the CEQA Guidelines
requires the DEIR to
analyze the viability of adding renewable energy systems to the
Project in order to mitigate its
impacts and “increase[e] reliance on renewable energy sources…”
Yet, the DEIR contains no
discussion of the appropriateness of renewable energy options for
the Project. Instead, MMAQ-
1d states that buildings must either exceed the energy efficiency
of the 2013 Building
Standards or offset energy use with 9 percent renewable
energy. As noted above, the 2016
Building Standards already exceed the energy efficiency of the
2013 Building Standards by a
substantial margin. As such, mere compliance with current law
would equate to compliance with
MM-AQ-1d, such the Applicant can entirely avoid incorporating any
renewable energy into the
Project. By omitting any discussion or analysis of renewable
energy options for the Project, the
City has violated CEQA. (See CCEC, 225 Cal.App.4th at 213.) This omission is
particularly
unfortunate because onsite solar energy could power most – if not
all – of the Project’s energy
needs.
XIX. Conclusion
Given the possibility that the Conservation Groups will be
required to pursue appropriate
legal remedies in order to ensure enforcement of CEQA, we would
like to remind the City of its
duty to maintain and preserve all documents and communications that
may constitute part of the
“administrative record.” As you may know, the administrative
record encompasses any and all
documents and communications which relate to any and all actions
taken by the City with
respect to the Project, and includes “pretty much everything that
ever came near a proposed
[project] or [] the agency’s compliance with CEQA . . . .” (County
of Orange v. Superior Court
(2003) 113 Cal.App.4th 1, 8.) The administrative record further
contains all correspondence,
emails, and text messages sent to or received by the City’s
representatives or employees, which
relate to the Project, including any correspondence, emails, and
text messages sent between the
City’s representatives or employees and the Applicant’s
representatives or employees.
Maintenance and preservation of the administrative record requires
that, inter alia, the
City (1)
suspend all data destruction policies; and (2) preserve all
relevant hardware unless an exact
replica of each file is made.
Thank you for the opportunity to submit comments on the Project.
We look forward to
working to assure that the Project and environmental review
conforms to the requirements of
state law and to assure that all significant impacts to the
environment are fully analyzed,
mitigated or avoided. In light of many significant, unavoidable
environmental impacts that will
result from the Project, we strongly urge the Project not be
approved in its current form. Please
do not hesitate to contact the Center with any questions at the
number listed below. We look
forward to reviewing the City’s responses to these comments in the
Final EIR for this Project
once it has been completed.
Sincerely,
J.P. Rose
Staff Attorney
Center for Biological Diversity
PMB 447, 8033 Sunset Blvd.
Los Angeles, CA 90046-2401
Ph: (408) 497-7675
Kim F. Floyd
Conservation Chair
San Gorgonio Chapter Sierra Club
/s/
Vicki Long
President
Cougar Connection
References
(Attached on USB Drive)
California Energy Commission, 2016 Building Energy
Efficiency Standards Frequently Asked
Questions.
http://www.energy.ca.gov/title24/2016standards/rulemaking/documents/2016_Building_
Energy_Efficiency_Standards_FAQ.pdf).
CAPCOA. 2008. California Air Pollution Control Officer’s
Association. CEQA & Climate
Change, Evaluating and Addressing Greenhouse Gas Emissions from
Projects Subject to the
California Environmental Quality Act.
Cayan 2007, California Climate Change Center, Our
Changing Climate: Assessing the Risks to
California
CEC-500-2006-077 (2006).
http://meteora.ucsd.edu/cap/pdffiles/CA_climate_Scenarios.pdf.
Commission for Environmental Cooperation, Greenbuilding in North
America: Opportunities
and Challenges (2008)
http://www3.cec.org/islandora/en/item/2335-green-building-in-north-americaopportunities-
and-challenges-en.pdf.
Ernest et al., 2014, Fractured Genetic
Connectivity Threatens a Southern California Puma
(Puma
concolor) Population, PLUS ONE.
http://journals.plos.org/plosone/article?id=10.1371/journal.pone.0107985
Jennings et al. (1994), Amphibian and Reptile
Species of Special Concern in California, CAL.
DEP’T. OF FISH & WILDLIFE 101, 102 (1994).
https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=83971
Lin et al., 2002, Childhood Asthma
Hospitalization and Residential Exposure to State Route
Traffic,
88 ENVIRONMENTAL RESEARCH 2 (2002).
Los
Angeles Times, “L.A.’s mountain lions
could be near extinction in 50 years” (Aug. 31, 2015)
http://www.latimes.com/science/sciencenow/la-sci-sn-mountain-lions-threat-20160830-
snap-story.html.
Pilliod et al. (2013), Terrestrial Movement
Patterns of Western Pond Turtles (Actinemys
marmorata)
in Central California, 8 HERPETOLOGICAL CONSERVATION & BIOLOGY 207,
207.
South Coast Air Quality Management District, Localized
Significance Thresholds.
http://www.aqmd.gov/home/regulations/ceqa/air-quality-analysis-handbook/localizedsignificance-
thresholds.
Spinks et al. (2003), Survival of the Western Pond
Turtle (Actinemys marmorata) in an Urban
California
Environment, 113 BIOLOGICAL CONSERVATION